Railway Maintenance & Repair Solutions
Railway infrastructure is continuously exposed to dynamic loading, repeated traffic, and environmental conditions that can lead to concrete deterioration, void formation, and track settlement. Cormix provides specialised repair and rehabilitation technologies designed to restore damaged track structures, improve stability, and minimise railway downtime.
Embedded Rail | Discrete Rail |
Rapid Concrete Slab Track Repair
Concrete track slabs can deteriorate through repeated loading, impact, and long-term service conditions. Condur EGHES(M) provides an ultra-high early strength repair solution for rapid reinstatement of damaged concrete surfaces where short maintenance windows and early reopening are required.
Typical Applications
Concrete Slab Track · Metro Tunnel · Tram Corridor · Rail Crossing
System Functions
- Rapid concrete reinstatement
- Ultra-high early strength development
- Repair of damaged track slab surfaces
- Reduced maintenance closure time
________________________________________
Rail Crossing Reinstatement & Slab Lifting
Settlement and voids beneath railway crossings can affect track level, slab stability and long-term performance. Fast-reacting rigid polyurethane foam can be injected beneath the affected structure to fill underlying voids, stabilise supporting ground and assist in restoring the slab or track to the required level.
Restoring Stability Beneath the Track
The polyurethane system is injected through controlled injection points beneath the affected slab. As the material reacts and expands, it fills underlying voids and transfers controlled lifting forces to the structure, allowing settlement to be corrected while improving support beneath the repaired area.
Designed for Rapid Track Rehabilitation
Fast-reacting technologies help minimise the time required for railway maintenance |
Injection technology allows settled concrete slabs to be progressively restored towards the required level |
Expanding polyurethane fills underlying voids and improves support beneath the track structure |
Targeted repair methods help reduce the extent and duration of track closures |
________________________________________
KEY PRODUCTS RANGE
| PRODUCTS | DESCRIPTION | DOCUMENTATION |
| Condur EGHES(M) | Ultra High Early Strength Epoxy Grout | Download TDS ↓ |
| Contite Slab Lift | A 2 Part Fast Setting Rigid Polyurethane Foam for Concrete Slab Lifting and Soil Stabilization | Download TDS ↓ |
| Contite PUE500/501 | A phthalate free fast reacting 2 component rigid polyurethane foam | Download TDS ↓ |
Contite PUE700/701 | A 2 Part Fast Setting Rigid Polyurethane Foam for Rock & Soil Condition | Download TDS ↓ |
________________________________________
FREE DOWNLOAD E-CATALOGUE
Download E-Catalogue >> Click Here
________________________________________
Need Support for Your Rail Project?